Peikko Group Global (English)
By the extension of the Logistic Center Ludesch they casted the precasted columns on site. So they used the column shoes and lifting system in the form work on site. Only the small columns were precasted inside the factory.
Günther Pock
Vertrieb & Anwendungsberatung West
Mob. +43 664 381 74 05 [email protected]